← Back to projects listing

Joseph Bartholomew Walking Path Drainage Upgrades

This project includes the design of improvements and repairs to a walking path on the north side of the Joseph Bartholomew Golf Course.  The walking path was removed from a previous capital project due to site drainage issues.  There was minimal or no site drainage in the open area, which resulted in water ponding during rain events.

For this project, Batture performed the following services:

  • Topographic Survey
  • Utility Survey
  • Drainage Design
  • Pavement Design
  • Hydraulic Analysis
  • Cost Estimating
  • Preparation of Plans and Specifications
  • EPA SWMM Modeling
  • Construction Administration