← Back to projects listing

Mirabeau Garden Stormwater Management and Flood Mitigation

This 25-acre stormwater management and green infrastructure demonstration park is located on a site that was previously a church campus. As part of the Gentilly Resilience District, this exciting demonstration project includes a pump station, energy dissipation runnel, large detention basins, multiple concrete weirs, observation walkways, and several buildings. Batture is a sub-consultant to Waggonner & Ball, LLC on this innovative project.

For this project, Batture performed the following services:

  • Topographic Survey
  • Utility Survey
  • Structural Engineering Design
  • Foundation Design
  • LID Concrete Design
  • Construction Administration

Project Status: Pre-Construction